Krimpenerwaard 2026
| Category | Rate water system levy | Rate road levy |
|---|---|---|
| Uncultivated and arable land per hectare | € 129.86 | € 42.97 |
| Built-up property % of the WOZ value | 0.0229% | 0.0282% |
| Non-residential buildings: % of the WOZ value | 0.0254% | 0.0282% |
| Residents per housing unit | € 152.25 | € 76.04 |
| Nature site per hectare | € 3.79 | € 42.97 |
| Uncultivated and arable land outside the dykes per ha | € 32.47 | € 42.97 |
| Built-up % of the WOZ value outside the dykes | 0.0056% | 0.0282% |
| Non-residential buildings: % of the WOZ value outside the dykes | 0.0064% | 0.0282% |
| Water system levy roads per ha | € 259.72 | € 42.97 |
| Water system levy roads outside the dykes per ha | € 162.33 | € 42.97 |
| Wastewater treatment levy | Rate |
|---|---|
| 1 unit of pollution (1ve) | € 79.34 |
| 3 units of pollution (3ve) | € 238.02 |