Directly to content
25 November 12:58 - Service and notifications RBG unavailable on Friday 28 November More information

2022 Rates Krimpenerwaard

Please find below the most prevalent rates for the area of Krimpenerwaard.

Krimpenerwaard 2022

Category Rate water system levy Rate road levy
Uncultivated and arable land per hectare € 96.04 € 37.44
Built-up property % of the WOZ value 0.0200% 0.0225%
Residents per housing unit € 109.80 € 46.61
Nature site per hectare € 3.50 € 37.44
Uncultivated and arable land outside the dykes per ha € 24.01 € 37.44
Built-up % of the WOZ value outside the dykes 0.0050% 0.0225%
Water system levy roads per ha € 192.08 € 37.44
Water system levy roads outside the dykes per ha € 120.05 € 37.44
Wastewater treatment levy Rate
1 unit of pollution (1ve) € 51.65
3 units of pollution (3ve) € 154.95